Preliminary Engineering Underway for Susitna Watana Dam 

By Dan Bross | KUAC – Fairbanks: Preliminary engineering is underway for the proposed Susitna Watana hydro electric dam.  The state has hired Colorado based MWH Global to develop designs for the project, which would provide rail belt power.

MORE

« back